

Terremark Colombia Inc., a wholly-owned subsidiary of Terremark Worldwide, opened the NAP de Las Américas Colombia in March 2008. One of the largest NAPs in Colombia with a total of 20,000 square feet of usable space and an exchange traffic of 1,087 Gbps. Clients include all major carriers operating in Colombia, as well as international and Colombian companies such as IBM de Colombia, BT Comsat, Synapsis and several government agencies. The Nap de Las Américas Colombia provides the same world class practices used by the NAP of the Americas® in Miami.
| Power |
| 99.98% AC power availability guarantee |
| Two redundant power feeds of 13.8 KV from Zona Franca electrical substation |
| Four (4) diesel generators in hot standby configuration powering 2.0MVA |
| Ten (10) UPS 2x120KVA redundant totalizing 1.2MVA |
| Two DC power lants DC for a total of 1200 Amps - 48Volts |
Customer electrical AC circuits in increments of 10 Amps, 10, 20, 30, 40 and 50 Amps circuits
CPS-backed power |
| Customer electrical DC circuits in increments of 5 Amps 5-20 Amps – 48 Volts DC circuit A&B feed |
Building and Connectivity Features
The HVAC systems at the NAP de las Américas Colombia have twelve (12) cooling units with Enviromental Precision Control Systems: Nominal 30 TR Air Cooled Down flow System, for a total of 360 TR of cooling.
Internal conditions of Temperature and Humidity are maintained at a temperature = 20ºC ± 2ºC and Relativity Humidity = 45% ± 5%.
| Building and Connectivity Features |
| Located in Zona Franca two-story building built to seismic-resistant specifications |
| 24x7x365 Monitoring |
| Uptime of 99,995% facilities and communications |
| 48,453 liters of fuel (Diesel) - continuous operation for 15 days of power generation at full load |
| One STM-1 Channel linking Nap of the Americas-Miami with Nap de Las Américas-Colombia |
Total Traffic: In Process 1,087Gbps
MRS Traffic: In Process 175Mbps |
| CMS Circuit Management System Software |
| Seven major communications carriers installed |